29 November 2009

The Carburetors 15th November 2009



Such an important part of the motor -

these two carburetors were overhauled

by Gavin before being fitted.

Door Catches 25th November 2009


The finicky door catches were among the many small items to be fitted and adjusted - all taking considerable time !

Patience being the essence.

8 November 2009

5th November 2009 THE BOX





This was the box with parts ordered from the UK.
among which were ...........
clutch adj rod, lever clutch, clutch link etc etc etc.........
cable choke, cable starter, fuel pipe etc.........
exhaust system for MG TD, coupling kit,
switch starter, horn brkt LH
body, bulb holder etc etc etc.........
side covers TD leather kit - sleeve seat back, strip set s/scn
V. panel & vinyl tri..........
seat slides, oil guage tube, connecter start cable
etc, etc, etc and many other small items !!!
Rather a super 'stand' which it arrived on do`nt you think ????






25 October 2009

24th October, 2009 Fitting the Exhaust




Inside view of part of the exhaust.
All necessary brackets had to be made by Gavin.

30th September 2009 Installing the Electrical System











The tedious job of taping the wiring


































All the details of the TD parts manufacturer








25.10.009 Starter Motor etc.

21 August 2009

17th August 2009 Gearbox View



The gearbox now installed
and gearbox cover fitted.
Lastly the footplate replaced.
All is now ready for the making and fitting of the floorboards...........................

16 August 2009

15th August 2009 Engine Installation


A slow process but the operation ran
very smoothly ...................











The thrilling process of installing the engine/gearbox into the TD



























20 July 2009

25th July 2009 Sanding, spraying of the bonnet etc.





The preparation of sanding & spraying of the bonnet parts and front mudguards took a long time.


15th July 2009 Steering Rack



Steering rack in position

5th July 2009 Fr mudguards & radiator temporary placement










Temporary fitting and checking front




mudguards, bonnet & radiator placement before installing the engine.

27 June 2009

26th June 2009 - Various Views of TD











Space in the garage is prebooked - "AGGIE" the TC has her corner -
but there is no space for the MGB GT while the TD Rebuild is taking place !!















21 June 2009

16th June 2009 Rear View of TD




























Various views of our TD showing the "full" garage.




















































7th June 2009 Sanding Front Mudguards










The tedious process of filling

and sanding the

front mudguards ready for spraying